A STORY TO TELL
 
 
 
[2008.07.11]
Olympic Intervention IV delivered three days ahead of schedule
The Ulstein Group delivered the Olympic Intervention IV to Olympic Shipping 11 July, three days before the contractual deadline. The ship is now ready for deep challenges in the Gulf of Mexico.

Read more
 
 
 
 
 MORE STORIES
 
 
 
[2008.07.02]
Mobilising for first assignment
[2008.06.25]
3 x Ulstein
[2008.06.10]
First ULSTEIN X-BOW® built at external yard launched
[2008.06.04]
WOULD BE NAVAL ARCHITECTS VISIT ULSTEIN SEA OF SOLUTIONS
 
 


ALL RIGHTS RESERVED BY THE ULSTEIN GROUP 2006                DESIGN BY FUGLEFJELLET.NO

StartpageAboutNewsDownloadsJobs & Careers